Vessela Cherneva: The real gas diversification in Bulgaria can come with the construction of the interconnector with Greece
Bogomil Manchev, Chairman of the Bulgarian Atomic Forum "Bulatom": There is a political pressure on the Belene NPP project
Prolongation of the validity of the concluded contracts for access and transport for gas year 2020-2021
ICGB utilizes first EUR 30 million in EIB loan for the realization of the Gas Interconnector Greece-Bulgaria
PMs Borissov, Mitsotakis Attend Ceremony for Entry of Bulgartransgaz in Alexandroupolis Liquefied Gas Terminal
Rosatom State Corporation signed Memoranda of Understanding with Framatome SAS and GE Steam Power on the Belene NPP