Minister Zhecho Stankov: When the state and business look in the same direction, the result is stable projects for the benefit of Bulgarian energy
Angelin Tsachev: The program of ESO and BDB will allow the sharing of clean energy between different institutions in our country
The state allocates a new 17 million leva for the construction of the first phase of the National Radioactive Waste Repository
liyan Vassilev on Negative Electricity Prices and Renewables: Losses for Producers Will Likely Be Covered Through Subsidies
Vice President: The contract with Botas was concluded in a very difficult period to guarantee the energy security not only of Bulgaria, but also of Europe
Financial consultant to be selected within a month for the construction of units 7 and 8 of Kozloduy NPP
Tasko Ermenkov: EWRC will seriously consider the investment intentions of companies in the energy sector
Vladimir Malinov: There are no violations in the public procurement for the drilling fund (the Chiren gas storage facility)