Bogomil Manchev: A procedure for construction of the unit VII of NPP Kozloduy will last at least 10 years, if it starts today
The EC has announced a wave of renovation of buildings in Europe as part of measures for Green Reconstruction
Minister Petkova: The Government gives a mandate to BEH to hold talks with American companies for the Seventh Unit of Kozloduy NPP
The share of RES in the transmission network of Bulgaria grows 11.75 per cent during 1 Jan to 11 Oct on annual basis
TPPs in the Maritza Iztok complex can switch to natural gas or hydrogen, but production will be low efficient
State energy regulator to big industrial consumers: more than 30 signals received from IBEX, ACER, market participants and their associations are checked
The balance (export - import) of electricity for the period January 1 - October 4 is minus 35.31 percent in Bulgaria
The entry of non-household electricity consumers on the free market will bring them long-term benefits
Vessela Cherneva: The real gas diversification in Bulgaria can come with the construction of the interconnector with Greece
Bogomil Manchev, Chairman of the Bulgarian Atomic Forum "Bulatom": There is a political pressure on the Belene NPP project